Construction Manager
احفظ هذه الوظيفة وحافظ على تنظيم بحثك
قم بإنشاء حساب مجاني لحفظ الوظائف وإنشاء التنبيهات والعودة إلى هذه القائمة من لوحة التحكم الخاصة بك.
بالمتابعة، فإنك توافق على الشروط & سياسة الخصوصية.
# Construction Manager
- Sphere TanksWe are looking for a field-proven, grit-and-steel Construction Manager to take full ownership of the site erection, assembly, and mechanical completion of spherical storage tanks (Hortonspheres) in the UAE.
This is a pure site-execution role. You will be responsible for managing heavy lift cranes, rigging teams, fit-up crews, and hundreds of specialized welders.
Because these spheres use high-thickness steel plates, you must have direct experience managing the physical challenges of heavy-wall
* Heavy Rigging & Plate Erection: Personally oversee the lifting schedules and crane setups (including heavy crawler cranes) for erecting the sphere's structural legs, temporary central derrick towers, and the heavy, formed "orange-peel" shell plates.
* Fit-Up & Alignment: Drive the crew to achieve flawless plate-to-plate alignment and fit-up on high-thickness joints before welding begins.
You are responsible for managing structural distortion and ensuring the sphere is perfectly round.
* Welding Workforce Productivity: Manage and push the daily productivity of high-pressure coded welders.
Ensure the site crews are actively maintaining continuous pre-heating on the thick steel plates to keep the welding momentum moving safely without cracking.
* Scaffolding & High-Altitude Safety: Direct the erection of massive internal and external scaffolding systems or rope-access setups required for workers to safely weld and inspect the sphere at height.
* Site Heat Treatment (PWHT) Execution: Coordinate the physical site logistics for turning the completed sphere into a temporary furnace.
Manage the sub-contractor handling the high-velocity burners, fuel lines, and insulation blankets for the full-scale baking cycle.
* Subcontractor & Labor Driving: Be the main driving force on-site.
Manage sub-contractors tightly, resolve daily labor bottlenecks, clear material staging issues, and ensure the physical construction matches the daily schedule targets.#### Requirements
* Field
Experience:
12+ years of heavy mechanical site construction experience, with a proven track record as the lead CM on-site for at least 2 completed Spherical Storage Tank projects.* The "High Thickness" Factor: Must demonstrate experience physically managing thick-plate steel fabrication where on-site PWHT (Post-Weld Heat Treatment) was successfully executed.
* Rigging Mastery: Deep understanding of heavy lifting plans, rigging tackle, and multi-crane tandem lifts for large pressure vessel segments.
* Leadership Style: Tough, field-tested leader who knows how to manage large labor workforces and subcontractors under tight deadlines and harsh site conditions.